Approved Contractor Application3. Preliminary Project Review
Approved Contractor Agreement
Project Profile (pdf)A project approval letter must be received from Inland prior to beginning a System Warranted Project. All Project Review pictures and documents should be sent to the following address:
Inland Coatings Corporation4. Specifications, Requirements, and Estimating
Warranty Department
P.O. Box 247
26259 Hwy 6
Adel, IA 50003
IMB350M-6 Specification (pdf)5. Inspections
General Requirements (pdf)
Spray Equipment Recommendations (pdf)
Round Penetration Detail Drawing (pdf) (Viewable JPG version)
Ridge Cap Detail Drawing (pdf) (Viewable JPG version)
Contractor shall provide the Inland Warranty Department at least two (2) weeks notice for scheduling of on-site inspections.
Please refer to the Inspection Zone Chart to determine the appropriate charge per inspection.
Inspection Zone Chart (pdf)The Inspection Charges must be submitted to Inland, and the initial inspection scheduled, before the start of the project to ensure that the inspections can be performed at the appropriate times. Inspection charges should be submitted to the following address:
Inspection Zone Map
Inland Coatings Corporation6. Projection Completion - Issuing of Warranty
Warranty Department
P.O. Box 247
26259 Hwy 6
Adel, IA 50003
The System Warranty should be completed and signed by both the "Approved Inland Contractor" and the building owner or "Owners Representative". The original, signed copy must be sent to Inland Coatings Corp.
Modified & BUR 5 Year System Warranty (pdf)The "Warranty Certification Statement" must be completed and signed by the Approved Inland Contractor".
Warranty Certification Statement (pdf)Pages 3 through 5 of the "Inland Project Profile" should be completed. This to include attaching copies of invoices, project pictures, etc.
Project Profile (pdf)The Roof System Warranty Fees Form should be printed out and completed. A check payable to "Inland Coatings Corporation" should be attached to the form.
Roof System Warranty Fees Form (pdf)Prior to mailing the warranty submittal packet, please refer to the "Warranty Checklist". This will ensure that all necessary information and documents are properly submitted.
Warranty Checklist (pdf)The completed Warranty Submittal Packet should be sent to Inland Coatings Corporation at the following address:
Inland Coatings Corporation
Warranty Department
P.O. Box 247
26259 Hwy 6
Adel, IA 50003